Case study · Automotive & suppliers
Manufacturer of drive and chassis components
170 fewer journeys per day
Key facts
- Customer
- ZF Friedrichshafen
- Location
- Friedrichshafen
- Client
- ZF Friedrichshafen
- Location
- Friedrichshafen
- Industry
- Powertrain and chassis components
- Number of employees
- 157,549
Initial situation
- Supplying production using front-loading forklifts
- Transport of steel boxes
- Limited space
- Replenishment by one materials supplier at each of six assembly lines
- Waiting times on the assembly line
- Stock discrepancies / faulty planning
- Heavy traffic
- High safety risk for staff
Customer requirement
- Two frame trolley storage bays
- Front-loading forklifts are to be phased out of production
- An effective tugger train system for materials delivery
- Due to limited space: high tracking accuracy, loading and unloading on both sides, use of no more than two trailers at any one time
LKE solution
- Virtual LKE coupling/drawbar system for optimum lane-keeping
- Production supply via a forklift-free tugger train system
- Custom-sized Cargo-Liner taxi trolleys > Can be integrated into the customer’s existing system
- Type X platform trolley > Add-on for transporting customised steel crates in the tugger train
Cargo-Liner SP2 taxi trolley
Customised solution for the transport of frame trolleys with customised steel boxes
- Two parking spaces
- Central hand lever
- Loading and unloading from both sides
- Secured drawbar
- Virtual coupling/drawbar system
- Toe guard on all castors
Type X platform trolley
Bespoke solution for the transport of customised steel boxes
- Two levels
- Stackable
- Loading and unloading from both sides
- Secured drawbar
- Virtual coupling/drawbar system
- Toe guard on all castors
Virtual coupling/drawbar system
For easy handling
- Optimal directional stability
- Simple foot operation
- Self-locking drawbar ensures that the trailers do not become uncoupled whilst in a convoy
Result
- Optimal directional stability thanks to the use of the LKE coupling/drawbar system
- 170 fewer journeys thanks to the use of Cargo-Liner
- Cost reduction of 70,000 euros per year
- Inventory discrepancies eliminated
- Reliable and timely delivery to the assembly stations
- Accurate material planning
- Time saved on material deliveries
- Reduced traffic volume
- Improved safety
- Space savings
Key figures
- Fewer journeys per day
- 170
- Annual cost reduction
- €70,000
- Stock discrepancies
- 0