Skip to content

Case study · Automotive & suppliers

Manufacturer of drive and chassis components

170 fewer journeys per day

Manufacturer of drive and chassis components

Key facts

Customer
ZF Friedrichshafen
Location
Friedrichshafen
Client
ZF Friedrichshafen
Location
Friedrichshafen
Industry
Powertrain and chassis components
Number of employees
157,549

Initial situation

  • Supplying production using front-loading forklifts
  • Transport of steel boxes
  • Limited space
  • Replenishment by one materials supplier at each of six assembly lines
  • Waiting times on the assembly line
  • Stock discrepancies / faulty planning
  • Heavy traffic
  • High safety risk for staff

Customer requirement

  • Two frame trolley storage bays
  • Front-loading forklifts are to be phased out of production
  • An effective tugger train system for materials delivery
  • Due to limited space: high tracking accuracy, loading and unloading on both sides, use of no more than two trailers at any one time

LKE solution

  • Virtual LKE coupling/drawbar system for optimum lane-keeping
  • Production supply via a forklift-free tugger train system
  • Custom-sized Cargo-Liner taxi trolleys > Can be integrated into the customer’s existing system
  • Type X platform trolley > Add-on for transporting customised steel crates in the tugger train

Cargo-Liner SP2 taxi trolley

Customised solution for the transport of frame trolleys with customised steel boxes

  • Two parking spaces
  • Central hand lever
  • Loading and unloading from both sides
  • Secured drawbar
  • Virtual coupling/drawbar system
  • Toe guard on all castors

Type X platform trolley

Bespoke solution for the transport of customised steel boxes

  • Two levels
  • Stackable
  • Loading and unloading from both sides
  • Secured drawbar
  • Virtual coupling/drawbar system
  • Toe guard on all castors

Virtual coupling/drawbar system

For easy handling

  • Optimal directional stability
  • Simple foot operation
  • Self-locking drawbar ensures that the trailers do not become uncoupled whilst in a convoy

Result

  • Optimal directional stability thanks to the use of the LKE coupling/drawbar system
  • 170 fewer journeys thanks to the use of Cargo-Liner
  • Cost reduction of 70,000 euros per year
  • Inventory discrepancies eliminated
  • Reliable and timely delivery to the assembly stations
  • Accurate material planning
  • Time saved on material deliveries
  • Reduced traffic volume
  • Improved safety
  • Space savings

Key figures

Fewer journeys per day
170
Annual cost reduction
€70,000
Stock discrepancies
0

More case studies

Satisfied customers since 1994.

See our case studies

Get in touch!

Our service is always on hand to support you as a competent partner. Your complete satisfaction – that is what we aim for. Please get in touch and we will prepare a bespoke quote for you.

  1. Save products Add trolleys and accessories to your enquiry list.
  2. Send enquiry With a single click – including all key technical specifications.
  3. Request a quote The sales team will get back to you with a specific recommendation.

Customer Service Team

Product advice and quotations